Dublin, CA · 2026
50,270 SF · 1.5 in overlay
5751 Arnold Road
A 50,270 SF asphalt overlay across the paved areas of a new development, placed around fresh curbs, planters and high utility boxes.
Our work
Paving, repair, maintenance and concrete work for HOAs, apartment owners, retail centers, schools, public agencies and industrial sites. Each project lists the scope, size and schedule.
Dublin, CA · 2026
50,270 SF · 1.5 in overlay
A 50,270 SF asphalt overlay across the paved areas of a new development, placed around fresh curbs, planters and high utility boxes.
Castro Valley, CA · 2026
4,760 SF demolished · 4 in asphalt
An apartment alley rebuilt from the base up: old pavement removed, a 140 LF concrete valley gutter poured, and 4,340 SF of new asphalt placed and sealed.
Alameda, CA · 2025
18,390 SF sealed
A school yard sealed in two coats and re-striped for play: four-square, hopscotch, volleyball and basketball lines, plus painted playground games.
Hayward, CA · 2020
2,300 tons of asphalt removed and replaced
A school site with soft subgrade found during demolition, treated with cement and lime and regraded before the new asphalt went down.
Oakland, CA · 2021
35,350 SF · 2 in grind and pave
Four city streets resurfaced to finish a new apartment complex covering a whole city block in downtown Oakland.
Cotati, CA · 2021
112,800 SF · 2 in grind and pave
A 112,800 SF grind and pave at a Cotati shopping center, completed in eight days while the center stayed open.
Concord, CA · 2022
66,000+ SF removed and replaced
A dealership lot rebuilt over unstable ground, with the solution worked out in the field.
Fremont, CA · 2022
34,500 SF of repairs · 4 in full depth
Failed areas rebuilt to full depth, then seal coat, stall striping, stall numbering and red curb throughout The Crossings HOA.
San Rafael, CA · 2020
43,000 SF of 4 in repairs · 1,400 SF of 1.5 in overlay
Concrete repairs, deep asphalt repairs and targeted overlays to clear up drainage issues for the Marin Lagoon HOA in San Rafael.
Alameda, CA · 2020
Pavement replacement and a new street at a working shipyard, for a client that keeps bringing us back.
Brisbane, CA · 2021
27,790 SF · 4 in and 6 in sections
A complete removal and replacement, finished in three days.
Hayward, CA · 2021
72,000 SF · 100 percent milled to 2 in
We milled and repaved 100% of two Hayward Hills streets in two days, with every household notified before we started.
No projects match that filter yet. Show all work.
Get started
Tell us about the property and what you are seeing. We will walk the site with you and put together a free estimate with the options that make sense.