Dublin, CA · 2026
50,270 SF · 1.5 in surface course
5751 Arnold Road
The 1.5 in final surface course over 50,270 SF of parking lot on a new building, placed once construction traffic was gone, around fresh curbs, planters and utility boxes.
Commercial Properties · Oakland, CA
A veterinary clinic's parking lot on Fruitvale Avenue in Oakland: 11,500 SF of asphalt removed and replaced, a new entrance landing and curb, and full restriping with ADA signage, scheduled around the clinic's patients.
The pavement was worn and cracked, and the markings had faded to almost nothing. The clinic needed a lot that worked and an entrance that met accessibility requirements, without losing days of appointments to get it.
The site was tight. It's a gated lot behind the building, shared with a school that rents part of it. Overgrown trees and bushes hung over the edges, and the grinder needed clear overhead room to get through.
Our estimator worked through the scope with the clinic, covering the pavement and the accessibility work together, and planned the schedule around its patient days. We recommended trimming the overgrown vegetation, which gave the equipment room to work and made the property look better.
The concrete went first, on Thursday, October 8, the day the clinic is closed. The crew sawcut and broke out the old entrance landing, removed the damaged curb, and formed and poured the new work. Before the asphalt work, the site was marked for underground utilities through USA North 811, the irrigation was shut off, and dated No Parking signs went up across the lot.
On Wednesday, October 14, the clinic stayed open while a milling machine ground out the old asphalt and loaded it straight into trucks. Customers parked on the street, and we roped off a walkway to the front door. On Thursday the crew fine-graded the base, adding ¾-inch recycled base rock where it was needed, then paved the lot in two lifts: a 2½-inch base course topped with a 1½-inch wearing course. On Friday we striped it: stalls, directional arrows, RESERVED stencils and the accessible stall. We also installed the detectable warning panels and the necessary signage.
The clinic has a new 4-inch asphalt lot, a new entrance landing and curb, clear striping and directional arrows, and an accessible stall with detectable warning panels. The work took four working days, and the clinic stayed open on every day it normally sees patients.
The one-page project spotlight (PDF) shows the before and after.
On site
More work
Dublin, CA · 2026
50,270 SF · 1.5 in surface course
The 1.5 in final surface course over 50,270 SF of parking lot on a new building, placed once construction traffic was gone, around fresh curbs, planters and utility boxes.
Castro Valley, CA · 2026
4,760 SF demolished · 4 in asphalt
An apartment alley rebuilt from the base up: old pavement removed, a 140 LF concrete valley gutter poured, and 4,340 SF of new asphalt placed and sealed.
Alameda, CA · 2025
18,390 SF sealed
A school yard sealed in two coats and re-striped for play: four-square, hopscotch, volleyball and basketball lines, plus painted playground games.