Dublin, CA · 2026
50,270 SF · 1.5 in surface course
5751 Arnold Road
The 1.5 in final surface course over 50,270 SF of parking lot on a new building, placed once construction traffic was gone, around fresh curbs, planters and utility boxes.
Multifamily & Apartments · Oakland, CA
Four city streets resurfaced to finish a new apartment complex covering a whole city block in downtown Oakland.
We reconnected with an old work colleague on this project when he called on us to help wrap up a beautiful new apartment complex encompassing one whole city block in downtown Oakland. The scope of work consisted of a 2-inch grind and pave over four city streets totaling 35,350 SF, and thermoplastic markings over the newly paved streets to delineate traffic lanes.
These weren't private parking lots. The streets were public right-of-way, busy with traffic, transit, deliveries and people on foot, so the resurfacing had to work around all of it.
Work like this falls under the City of Oakland Department of Transportation, and closing all four streets at once was never an option. The paving itself was straightforward. The real job was planning it so the block stayed open.
We sat down with the general contractor and put together a phasing plan that met the City's requirements and still gave our crews room to work. We took the streets one after another instead of all at once, so access stayed open at every stage of the job.
Each section was ground down 2 inches, paved and brought back to grade before we opened up the next one. Once the new asphalt had cured, we applied thermoplastic markings to bring back crisp, clear traffic lanes.
Four streets resurfaced and remarked in just four days, with public access open the whole time and the City's requirements met at every phase. A good way to help an old colleague finish the job.
Forticon was great to work with at our Lydian Apartments Project in Oakland. Everardo went above and beyond by helping us put together a phasing plan that was able to accommodate the City of Oakland DOT requirements, allowing us to execute a fine paving and striping job, while maintaining public access at all times.
On site
More work
Dublin, CA · 2026
50,270 SF · 1.5 in surface course
The 1.5 in final surface course over 50,270 SF of parking lot on a new building, placed once construction traffic was gone, around fresh curbs, planters and utility boxes.
Castro Valley, CA · 2026
4,760 SF demolished · 4 in asphalt
An apartment alley rebuilt from the base up: old pavement removed, a 140 LF concrete valley gutter poured, and 4,340 SF of new asphalt placed and sealed.
Alameda, CA · 2025
18,390 SF sealed
A school yard sealed in two coats and re-striped for play: four-square, hopscotch, volleyball and basketball lines, plus painted playground games.