A repaved downtown Oakland street reopened to traffic alongside new apartment development.

Service area · Alameda County

Commercial asphalt paving contractor in Oakland, CA

Parking lot repair, repaving, striping and concrete for commercial properties across Oakland, from downtown to Fruitvale Avenue.

Oakland has nearly every pavement condition in the Bay Area in one city: downtown streets under City DOT control, industrial yards on soft estuary ground and retail lots along the commercial corridors.

Whatever the site, we handle the whole job, from repair and repaving to striping, concrete and ADA work, so you deal with one contractor from start to finish. Our office is downtown on Clay Street, so a site walk is never far away.

Map of the San Francisco Bay Area with Alameda County highlighted and Forticon's office in downtown Oakland marked. Sonoma County Napa County (outside our service area) Solano County Marin County Contra Costa County San Francisco Alameda County San Mateo County Santa Clara County Oakland · our office
Oakland is in Alameda County (highlighted). Shaded counties are the ones we serve; the diamond marks our office at 1300 Clay Street, Oakland.

What we do

Commercial paving services in Oakland

Parking lot repair and repaving in Oakland

Many Oakland lots don't need to be replaced. They need the failed spots fixed: the entrance where every car brakes and turns, the dumpster pad, the low corner around the catch basin, and old trench patches that have settled.

Which spots fail first depends on the property. Retail lots along the commercial corridors take constant short-stay traffic, while industrial yards in West Oakland and by the estuary take trucks. Either way, the fix is the same: cut out the failed sections and replace them at full depth, which lasts far longer than another round of cold patch. Our asphalt repair page explains how that works.

Spot repairs stop making sense once the damage spreads. When the surface is worn across most of the lot but the base still holds, re-asphalting with an overlay or grind and pave is usually better value. When the base itself has failed, removal and replacement costs less over time. We tell you which one your lot needs after we've walked it.

The St. Louis Veterinary Clinic on Fruitvale Avenue, for example, was past patching. We milled out and replaced 11,500 SF of asphalt at 4 inches, rebuilt the entrance landing and curb, and restriped the lot in four working days, without closing the clinic on a single day it normally sees patients.

A milling machine grinding out an Oakland clinic's old asphalt and loading it into a dump truck.

Parking lot striping and ADA restriping

Restriping is a good time to check the layout. Accessible stalls need the right count, a marked access aisle and a surface that's close to level, and paint can't fix a slope. We stripe occupied lots in sections so the business stays open. Our parking lot striping page covers the details, and we also install signs and concrete wheel stops.

Most parking lots are striped with waterborne traffic paint, which dries quickly and is easy to change if the layout changes. On city streets we use thermoplastic.

Fresh stall lines and a white directional arrow on a newly paved Oakland parking lot, with the striping machine parked behind.

Commercial concrete

We pour the concrete that goes with a paving job: curb and gutter, valley gutters, entrance landings, curb ramps, dumpster pads and walkways on commercial property. It's usually poured before the paving, so the asphalt has a finished edge to meet.

At the St. Louis Veterinary Clinic, that meant a new entrance landing and curb the week before paving. Our concrete sitework page covers the full range.

An old concrete entrance landing broken out at an Oakland clinic's front door before the new landing was poured.

Working on downtown streets

Downtown Oakland streets are public right-of-way, busy with traffic, transit, deliveries and pedestrians. Work there falls under City of Oakland Department of Transportation requirements, and closing several streets at once isn't an option.

Blocking a sidewalk, curb, parking lane or traffic lane in Oakland takes an obstruction permit from OakDOT before work starts, usually with an approved traffic control plan. Digging in the right-of-way takes a separate excavation permit. We sort out both before we mobilize, so the permit doesn't set the schedule.

At 226 13th Street, the Lydian Apartments development covering a full city block, we ground and repaved four city streets totaling 35,350 SF to 2 inches and remarked them with thermoplastic in four days, keeping public access open at every stage.

Two Forticon crew members rolling new asphalt at a downtown Oakland intersection.

The estuary and the flats

The industrial land along the estuary and through West Oakland sits on low, soft ground. Pavement there depends more than usual on a solid aggregate base and a subgrade that can really carry the load.

It's also where a site walk tells you the least. Conditions show up once the old pavement comes off, so on a removal and replacement project near the waterfront, we talk through ahead of time what happens if the subgrade isn't what everyone expected.

Accessibility on older commercial property

Oakland has a lot of retail storefronts, older commercial buildings and public accommodations, and much of their parking was built before today's accessibility standards.

Under California's Unruh Civil Rights Act, non-compliant conditions carry statutory damages of at least $4,000 per violation, plus attorney's fees. Exterior accessibility, including stall slopes, access aisles, curb ramps and path of travel, is often where claims start. Our ADA improvements page covers what the fixes involve, and restriping is usually the cheapest first step: see striping and ADA restriping above.

In their words

What Oakland clients say

  • Everardo went above and beyond by helping us put together a phasing plan that was able to accommodate the City of Oakland DOT requirements.

    Agustin ValverdeSenior Project Manager, Lydian Apartments project, Oakland
  • A job well done, with attention to detail and courtesy.

    Frank ZeidanEarth Circles Counseling Center166 Santa Clara Avenue, Oakland, CA

Questions

Working in Oakland

How much does parking lot replacement cost in Oakland?

It depends on the size of the lot, how deep the failure goes and what else is included. For scale, the St. Louis Veterinary Clinic job on Fruitvale Avenue came to $71,590. That covered milling out and replacing 11,500 SF of asphalt at 4 inches, a new entrance landing and curb, full restriping, ADA signage and detectable warning panels. Many lots need only targeted repairs, which cost far less. We give you a written estimate after walking the lot.

Can you work around our business hours?

Yes. We phase the work around your hours: noisy or disruptive steps on days you're closed, and a safe walkway to your door on days you're open. We agree the schedule, access and notices with you before we start.

Do I need a permit for paving work in Oakland?

It depends on where the work is. Blocking a sidewalk, curb, parking lane or traffic lane needs an OakDOT obstruction permit, and digging in the street needs an excavation permit. We confirm what your job needs before we schedule it.

Can you handle downtown work with no lay-down area?

Yes. That's normal downtown. It shapes the phasing and the schedule, and we include it in your price from the start, so there are no surprises later.

Where is Forticon's Oakland office?

1300 Clay Street, Suite 600, Oakland, CA 94612. We've been based in Oakland since we started in 2015.

Every project in Oakland is run from Forticon's office at 1300 Clay Street, Suite 600, Oakland, CA 94612 · (510) 328-3230

CA License #1006053 A (Class A General Engineering) · In business since 2015 · Member of BOMA Oakland/East Bay, California Association of Community Managers

Reviewed by Ryan Clark, Estimator / Project Manager · Updated · Photos are Forticon's own, taken on our job sites.

Get started

Ready for a site walk in Oakland?

Tell us the address and what's going wrong. An estimator will walk the site and tell you what's actually failing before quoting anything.