Dublin, CA · 2026
50,270 SF · 1.5 in overlay
5751 Arnold Road
A 50,270 SF asphalt overlay across the paved areas of a new development, placed around fresh curbs, planters and high utility boxes.
Industrial Properties · Alameda, CA
Pavement replacement and a new street at a working shipyard, for a client that keeps bringing us back.
Bay Ship Co. in Alameda has called us back for pavement replacement and new street installation work many times over the years. This was one of those jobs.
A working shipyard is one of the tougher places to pave in the Bay Area. The pavement takes concentrated loads from heavy equipment and industrial traffic, not the lighter car traffic a parking lot is built for, and the site sits right on the water.
The yard also has to keep running. We plan our work around the facility's day, not the other way around.
We removed the failed pavement areas and replaced them with a section built for industrial loads, and installed new street where the facility needed access it didn't have before.
A compact seven-person crew handled the work over a single week, sized to keep the yard running smoothly around us rather than to push for the most output per day.
Delivered in one week, with the yard running throughout. Bay Ship Co. has kept bringing us back since.
On site
More work
Dublin, CA · 2026
50,270 SF · 1.5 in overlay
A 50,270 SF asphalt overlay across the paved areas of a new development, placed around fresh curbs, planters and high utility boxes.
Castro Valley, CA · 2026
4,760 SF demolished · 4 in asphalt
An apartment alley rebuilt from the base up: old pavement removed, a 140 LF concrete valley gutter poured, and 4,340 SF of new asphalt placed and sealed.
Alameda, CA · 2025
18,390 SF sealed
A school yard sealed in two coats and re-striped for play: four-square, hopscotch, volleyball and basketball lines, plus painted playground games.