Dublin, CA · 2026
50,270 SF · 1.5 in overlay
5751 Arnold Road
A 50,270 SF asphalt overlay across the paved areas of a new development, placed around fresh curbs, planters and high utility boxes.
Schools & Churches · Alameda, CA
A school yard sealed in two coats and re-striped for play: four-square, hopscotch, volleyball and basketball lines, plus painted playground games.
Cracks were swept and filled with cold-applied filler first, then the seal coat went on in two coats with a latex additive in the first. A crew of five did the seal coat in one day: a foreman and operator, a second operator, a squeegee laborer, a tank driver and a superintendent.
With the surface ready, the crew chalked the layout of every court and game directly onto the yard, set the striping machines on tarps, and painted the lines and stencils by machine and by hand.
The yard has a fresh dark surface with its courts and games laid out again: four-square, hopscotch, volleyball, a half basketball court, door hash areas and the painted playground graphics.
On site
More work
Dublin, CA · 2026
50,270 SF · 1.5 in overlay
A 50,270 SF asphalt overlay across the paved areas of a new development, placed around fresh curbs, planters and high utility boxes.
Castro Valley, CA · 2026
4,760 SF demolished · 4 in asphalt
An apartment alley rebuilt from the base up: old pavement removed, a 140 LF concrete valley gutter poured, and 4,340 SF of new asphalt placed and sealed.
Hayward, CA · 2020
2,300 tons of asphalt removed and replaced
A school site with soft subgrade found during demolition, treated with cement and lime and regraded before the new asphalt went down.