Marin Lagoon HOA was performed for the Marin Lagoon HOA in San Rafael via Reliable Pavement Services and consisted of miscellaneous concrete pavement repairs, 43,000 SF of 4”deep repairs, and 1,400 SF of 1.5" asphalt overlays to alleviate low spots causing drainage issues.
Jobsite Address:
Bridgewater Drive, San Rafael
Job Duration:
4 days
Men:
14
Value:
$183,400.00
Marin Lagoon HOA was performed for the Marin Lagoon HOA in San Rafael via Reliable Pavement Services and consisted of miscellaneous concrete pavement repairs, 43,000 SF of 4”deep repairs, and 1,400 SF of 1.5" asphalt overlays to alleviate low spots causing drainage issues.
Jobsite Address:
Bridgewater Drive, San Rafael
Job Duration:
4 days
Men:
14
Value:
$183,400.00