Pavement glossary
Plain-language definitions to help property owners, managers, HOA boards, and general contractors understand pavement conditions, treatment options, and paving proposals.
Materials and pavement structure
Asphalt Concrete (AC) / Hot-Mix Asphalt (HMA)
A paving material made from stone, sand, and asphalt binder. Commonly called “asphalt” or “blacktop,” it is used for parking lots, roads, and driveways. Hot-mix asphalt is produced and placed at elevated temperatures, then compacted to form the pavement surface.
Asphalt Paving serviceConcrete
A construction material made from cementitious materials, water, sand, and stone, used for sidewalks, curbs, gutters, ramps, and pavement. Plans may refer to it as Portland Cement Concrete (PCC). Modern mixes may use portland-limestone cement or other blended materials. Cement is an ingredient in concrete, not another name for the finished material.
Concrete Sitework serviceAggregate Base / Base Rock
A compacted layer of graded crushed stone or other approved aggregate beneath the asphalt or concrete. It provides support and helps distribute traffic loads to the soil below. Its thickness, condition, and compaction affect the performance of the pavement above it.
Subgrade
The soil beneath the pavement’s aggregate base or other supporting layers. It forms the foundation of the pavement system. Weak, wet, or poorly compacted subgrade may require additional preparation or treatment before paving.
Pavement conditions and problems
Alligator Cracking / Fatigue Cracking
A network of interconnected cracks resembling an alligator’s skin. This pattern can indicate that the pavement is failing under repeated loads, potentially involving inadequate thickness or support. Sealcoating or filling the cracks alone does not correct the underlying structural problem.
Raveling
The gradual loss of sand and stone particles from the asphalt surface. The pavement becomes rougher and may leave loose material behind. Treatment depends on the severity and cause; early surface deterioration may be suitable for maintenance, while advanced deterioration may require more extensive repairs.
Pothole
A localized hole where pavement material has broken apart and been lost. Potholes can develop as traffic and water worsen existing damage. Repair may require removing surrounding failed asphalt and addressing inadequate support before installing new material.
Settlement / Pavement Depression
An area where pavement has sunk below the surrounding surface. Settlement may result from movement or inadequate support beneath the pavement, including around utility trenches. The cause should be evaluated before repair because simply filling the low spot may not prevent it from returning.
Ponding / Standing Water
Water that collects and remains in a low area instead of draining away. Ponding can be associated with pavement depressions, insufficient slope, or drainage obstructions. Correcting it may require changes to pavement elevations or drainage features; sealcoating does not correct drainage.
Maintenance and repair options
Resurfacing
A broad term often used to describe renewing an existing pavement surface. In asphalt paving, it commonly refers to an overlay, but property owners may also use it when asking about sealcoating, slurry seal, or complete replacement. These treatments involve different work and costs, so “resurfacing” alone does not define a scope. When requesting an estimate, describe what you’re seeing—such as fading, loose material, cracks, potholes, or standing water—and what you want to improve. Your contractor can then help identify the appropriate treatment.
Resurfacing & Overlays serviceCrack Sealing
Placing a suitable sealant into prepared pavement cracks to help limit water and debris entering them. It is a maintenance treatment, not a structural repair. Some cracking can be sealed effectively, while extensively cracked or failed areas may require asphalt removal and replacement.
Crack Sealing serviceSealcoating
Applying a protective maintenance coating over existing asphalt. Sealcoating helps protect suitable pavement from weathering and refreshes its appearance. It does not add structural strength or fix potholes, significant settlement, or failed pavement. Necessary repairs should be addressed before coating.
Sealcoating serviceFog Seal
A light spray application of diluted asphalt emulsion that helps seal surface pores and hold loose surface particles in place. It may also be recommended on suitable newly paved asphalt to help reduce early raveling associated with cool-weather paving conditions. It does not replace proper compaction or repair structural problems. Application requires suitable weather and adequate curing before reopening to traffic.
Slurry Seal
A surface maintenance treatment made from asphalt emulsion, graded fine aggregate, water, mineral filler, and additives as needed. Spread over prepared pavement, it forms a thin wearing surface. It differs from conventional parking-lot sealcoating and does not correct structural failure or a failed base.
Asphalt Patching / Localized Repairs
Repairing specific damaged areas rather than replacing an entire parking lot or roadway. Methods vary, from temporary surface patches to removing and rebuilding failed sections. The proposal should identify the repair method, limits, depth, and whether work to the underlying base is included.
Asphalt Repair serviceBase Repair
Work to correct inadequate support beneath the pavement. Depending on conditions, this may involve removing unsuitable base material, replacing it with approved aggregate, and compacting it. If the underlying soil also requires treatment, that work should be clearly identified in the scope.
Asphalt Repair serviceAsphalt Overlay
Installing a new layer of asphalt over existing pavement after appropriate preparation and repairs. An overlay can renew the surface and add pavement thickness when existing conditions support it. Drainage, elevations, and underlying failures must be evaluated before deciding whether an overlay is appropriate.
Resurfacing & Overlays serviceRemoval and Replacement (R&R)
Removing existing asphalt from a defined area and installing new asphalt in its place. The scope should state the removal depth and new compacted thickness. Removing asphalt does not automatically include replacing the base beneath it; any base repairs should be identified separately.
Removal & Replacement servicePaving methods and construction details
Milling / Cold Planing / Grinding
Using specialized equipment to remove a controlled thickness of asphalt. Milling can prepare pavement for an overlay, remove deteriorated material, or create room to maintain existing elevations. The scope may cover an entire surface or only selected areas.
Grind and Conform
Grinding selected portions of existing pavement so new asphalt can transition into adjoining surfaces that will remain, such as a roadway, driveway, or concrete gutter. This creates room for the new asphalt at the connection. It does not necessarily mean grinding the entire project area.
Tack Coat
A thin application of asphalt bonding material, typically an emulsion, placed between pavement layers or on prepared contact surfaces. It helps the new asphalt bond to the existing surface so the layers work together. Tack coat is different from sealcoating.
Lift
An individual layer of asphalt placed and compacted during paving. A project may require one or several lifts, depending on the total pavement thickness, mix, and specifications. The thickness of one lift is not necessarily the total thickness of the finished pavement.
Compaction
Densifying asphalt, aggregate base, or soil using rollers or other equipment. Proper compaction helps the material support loads and resist movement. Different materials require different methods, moisture conditions, or temperatures to achieve the specified result.
Compacted Thickness
The finished thickness of an asphalt layer after rolling and compaction. It differs from the loose thickness initially placed. When comparing proposals, confirm that the stated asphalt thickness refers to the finished, compacted material.
Drainage and utilities
Slope / Grade
The incline and elevations of a pavement surface. Slope influences how water drains and how the pavement connects to buildings, sidewalks, gutters, and adjoining areas. It is often expressed as a percentage; a 1% slope means one unit of vertical change over 100 units of horizontal distance.
Asphalt Berm / Dike (Dyke)
A raised asphalt curb typically installed along the edge of pavement to help direct surface water or keep runoff from flowing into adjacent areas. Often called an “asphalt berm” or “asphalt dike,” its shape, height, and placement depend on the site and drainage needs. The proposal should identify its dimensions and location, including any openings needed for drainage.
Drain Inlet / Catch Basin
A drainage structure that receives surface water through a grate or opening and directs it into a drainage system. A catch basin typically includes space below the outlet where sediment can collect. When paving around an existing inlet, its elevation and the surrounding pavement slope affect how water reaches it. Cleaning, repairs, or replacement should be identified separately in the proposal.
USA Markings / Underground Utility Markings
Temporary paint marks or flags used to identify the approximate location of underground utilities before excavation. In this context, USA stands for Underground Service Alert, commonly accessed by calling 811. Different colors identify utility types, such as gas, electricity, water, and communications. These markings do not establish exact depth, and privately owned utility lines may require a separate locating service.
Utility Adjustment to Grade
Raising or lowering an existing utility cover, frame, valve box, or similar feature to match the finished pavement elevation. This may be needed when an overlay raises the surface or paving changes existing grades. The proposal should identify which structures will be adjusted and whether the work is performed by the paving contractor, another trade, or the utility owner.
Pavement markings
Striping / Pavement Markings
Lines, symbols, lettering, and other markings applied to pavement to organize parking and guide traffic. Examples include parking stalls, directional arrows, crosswalks, and accessible parking symbols. The proposal should identify the layout, quantities, and marking materials included.
Parking Lot Striping serviceThermoplastic Pavement Markings
A pavement marking material applied using heat that hardens as it cools. Commonly used for crosswalks, stop bars, arrows, and traffic lines, thermoplastic is generally thicker and more durable than conventional traffic paint. It can be applied as a molten material or as preformed shapes bonded to the pavement with heat. The proposal should identify the locations, marking type, and surface preparation included.
Parking Lot Striping serviceUnderstanding your proposal
Scope of Work
The written description of the work included in a proposal or contract. It should identify the areas, quantities, materials, preparation, and construction activities covered, along with exclusions. Comparing scopes carefully helps reveal why two proposals may have different prices.
Allowance
An amount included in a proposal for an item whose exact cost or quantity is not yet known, such as potential additional base repairs. The proposal should explain what the allowance covers, how its use is authorized, and how the final price is adjusted.
Phasing
Dividing a project into separate work areas or stages to manage parking, traffic, and access during construction. Phasing can help keep portions of a property available while other sections are closed. The plan should explain closures, alternate routes, and reopening requirements.
Common proposal measurements
SF Square Feet
A measurement of area, commonly used for paving, sealcoating, and concrete work. A rectangular area 10 feet wide by 20 feet long measures 200 square feet.
SY Square Yards
A measurement of area equal to nine square feet. Divide square feet by nine to calculate square yards.
LF Linear Feet
A measurement of length, commonly used for curbs, crack sealing, saw cutting, and striping. It measures distance without expressing the width or depth of the work.
TON Ton
A measurement of material weight. In typical U.S. paving proposals, one ton equals 2,000 pounds. Tonnage alone does not establish the paved area or finished thickness; those should also be specified.
EA Each
A count of individual items, such as wheel stops, signs, or pavement arrows. For example, “6 EA wheel stops” means six wheel stops. The proposal should specify whether the price includes furnishing, installation, removal, or other associated work.
LS Lump Sum
A single total price for a defined item or scope of work rather than a price per square foot, linear foot, or ton. The description should clearly explain what that amount includes.